CDH6000: FEATURES
• The CDH6000 must be fitted with a calibrated leak to deliver a known quantity of gas H2 N2 (5% hydrogen) at a given pressure.
• If the pressure displayed on the gauge of CDH6000 does not exceed 1 bar, change the cartridge (maximum pressure: 4 bar)
• To purchase cartridges filled with gas H2 N2 (5% hydrogen) contact ATEQ.
Tips : When the operator has finished using the calibrator CDH6000 disconnect the calibrated leak and store in its case and avoid the excessive pollution of the test area.
CDH6000: OPERATIONS
CARTRIDGE EXTENSION
CARTRIDGE EXTRACTED
To change the cartridge, remove it by pressing the button on the connector. Then, insert a new cartridge by sliding it down until it “clicks” into place
Install the calibrated leak on the input connector of the CDH6000